Capitol Hill Apartments – Construction Update – September

Apartment, Capitol Hill, Construction Update, Grouparchitect, in progress, Seattle | Comments Off on Capitol Hill Apartments – Construction Update – September

The construction process for Capitol Hill is coming along, we are taking advantage of the sunny weather in Seattle.  The framing and sheathing was just completed on the third floor, and we had our first peak at the amazing views toward Lake Washington on the deck of level four.  The team will soon begin framing […]

28
Aug

Northwest Christian Church Completion

Finishes, Grouparchitect, Project Update, Remodel, Remodeling, Renovation, Seattle, Uncategorized | Comments Off on Northwest Christian Church Completion

An uplifting finish renovation of Northwest Christian Church’s sanctuary was inspired by the already existing space. The design focused on highlighting the existing structure which featured soaring exposed wood beams and extensive stain-glass windows. The paint, carpet and finishes were selected for cohesive color in a reverent space.

21
Aug

Distillery Lofts Completion

Commercial, Construction, Grouparchitect, Remodel, Renovation, Seattle | Comments Off on Distillery Lofts Completion

Grouparchitect was in need of a new refreshing remodel for the office. The goal was to maximize daylighting and take advantage of the existing views of Lake Union. Existing concrete and wood was sandblasted to become exposed and show the true character of the materials. Materials were creatively repurposed to reduce landfill and extend the […]

7
Aug

Ravenna Option 3.2 Completion

Grouparchitect, Home Design, Interior Design, Modular, Prefab, Prefab, Prefab/Modular, Prefabrication, Seattle | Comments Off on Ravenna Option 3.2 Completion

This prefab residence is one of the option series Grouparchitect collaborated with Method Homes.  This home  was customized to meet the needs of the homeowners and their unique site.  It is located within Seattle’s Ravenna neighborhood.  This modular home has (3) bedrooms, (3) bathrooms, spacious living spaces, and a garage and den space partially below […]

31
Jul

Lake Sammamish Remodel Completion

This project was a remodel to the existing kitchen of a Lake Sammaish residence. The original home is classic mid-century kitchen renovated into a modern space with clean lines. This gave way to open the floor plan to connect the living room, dinging and kitchen. The Pental Quartz counter space organized the occupied area gracefully with […]

15
Jul

Capitol Hill Construction-Update-July

Progress on our Capitol Hill Apartment is coming along. These past few weeks, the concrete level and PT deck have been placed and cured making way to start the framing process. Framing for Level 2 above the PT concrete deck is underway and it is awaiting the joist construction for the Level 3 floor deck.Window studs […]

10
Jul

Phinney Ridge Completion

This project for Phinney Ridge Prefab was the first of the option series, a line of prefabricated modular homes, built in Seattle by Method Homes. This option home series was customized to meet the owner’s needs for a three bedroom plus den, three and a half bath home. Built on a tight urban lot, this […]

2
Jan

Phinney Ridge Prefab – Module Set

Exciting news on the Pre-fab home front here at Grouparchitect!  The latest collaboration with Method homes is taking shape in the Phinney Ridge neighborhood of Seattle.  This Option series house has been in the works for the last few months, and as detailed in previous blog posts progress has been continuing steadily.  The most exciting part […]

7
Aug

Laurelhurst Residence – Wine Room

Progress on the Laurelhurst Residence Wine Room progressed quickly once the framing was completed.  Carpenters fabricated several wine racks designed to fit into the various niches and nooks that resulted from tucking the wine room into a difficult corner of the home.  The raw wood of the racks compliment the natural slate floor, and when […]

1
Aug

TDX Renovation work begins

Commercial, Construction, In Progress, Multi-family/Mixed Use, Phasing, Remodeling, Residential, Seattle | Comments Off on TDX Renovation work begins

Construction is now underway on the renovation of Theta Delta Chi at the University of Washington. Work is beginning on the portico deck. Improvements to this portion of the building will include rot and damage repair, repairing of the columns & capitals, railing repair, a new waterproof deck, and improved access to the deck. Additional […]

1
May

Laurelhurst Residence – Wine Room Sketches

Custom home, Grouparchitect, Remodeling, Residential, Seattle | Comments Off on Laurelhurst Residence – Wine Room Sketches

Earlier in April, we were excited for the opportunity to work, once again, with great clients on a small wine room renovation to their home.  The previously completed new construction left some room for renovation as the clients grew into the home and developed some ideas of how to improve the home to suit their needs better. […]

22
Apr

Structural Engineers Of The 1962 Seattle World’s Fair

Events, Seattle | Comments Off on Structural Engineers Of The 1962 Seattle World’s Fair

We want to help get the word out for a film screening  focusing on iconic local architecture at the U.W. Architecture Hall later this week.  The film “Structural Engineers of the 1962 World’s Fair” will detail designs done for the Space Needle, Washington Coliseum, and more. The event is jointly sponsored by the University of Washington Department of […]