LIV Apartments – Aerial Photos – Oct.

October at the LIV Apartments was a busy month.  The most notable progress on site over the last month would probably be the framing of the North Building, which topped out at its highest point.  This signals the completion of the framing for phase 1 of the project.  The roof and waterproofing will soon follow in an effort to minimize the exposure to the moist fall weather. The East Building, adjacent to 156th Ave NE, underwent a quick transition as subsurface...

LIV Apartments – Construction Update – September

September at the LIV Apartments was a busy month.  Trades worked on all aspects of the project from exterior cladding detailing and painting to interior gypsum board and work on unit interiors.  At the West Building, the gateway feature wall takes shape as the composite wood panels are installed and frame the western entrance to the site from Bel-Red Road. Along Bel-Red Road the massing of the west and north buildings can be seen as the gateway wall emphasizes the entry...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – Sept

The month of September brought progress across all areas of the LIV Apartments in Bellevue.  The South Building roof has been installed and progress continues on the window and exterior siding installation.  Interior plumbing and electrical rough in proceed in conjunction to maximize the potential of scheduling trades. Elsewhere, at the West Building, painters have begun to paint the exterior fiber cement board as the installation of the composite wood panel, metal panel, and brick masonry has nearly finished. The North Building...

LIV Apartments – West Gateway

Original post 05/23/2014 As framing progresses at the LIV Apartments, a major design feature of the project is starting to take shape.  The “gateway” entrance off Bel-red Road is adorned with two story feature walls on both the North and West buildings, with the West building wall framing now ready to receive exterior sheathing. These walls will be clad with composite wood panels accented by random arrangements of different sized windows that announce the entry point to the project.  This playful gesture hints...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update – August

The month of August brought advances to several areas of construction at the LIV Apartments in Bellevue.  Framing across the site continues upward as crews race to beat the oncoming fall weather. The North Building, the largest of the buildings, framing reached to level five of eight.  Construction speed was increased on the project by using panelized walls which arrive at the site ready to erect. The framing of the South Building was completed and efforts there have shifted towards sealing the...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – August

Since the previous LIV Apartments aerial update last month, the progress on the three phase 1 buildings has continued, and construction broke ground on the East building.  The second phase of the project will include 99 residential units, several large amenity spaces, and two large roof decks. Elsewhere on site progress continues at a fever pitch.  The most notable progress as seen from the air would be the progress on the North Building framing.  Framing work is now continuing on level...

LIV Apartments – Aerial Photos – July

The LIV Apartments progress continues into July as framing has started on the north building’s level 3 and framing has progressed to level 7 of the south building.  Panels and other materials have begun to be staged on the top post tensioned level of the north building as framing on level 4 will soon begin.Covered in a new high albedo roof, the west building officially topped out and efforts have now shifted towards waterproofing the exterior and installing windows. The...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update – June 2014

The month of June brought many advances to the LIV Apartments job site.  The most notable progress coming as the south building wood framing commenced.  With the previous experience of framing the west building the crews have picked up the pace and are moving very quickly with installing the panelized framing sections.Wood framing for the south building commenced, and reached to level 6 before the end of the month.  As progress continues vertically, other building elements are added such as...

LIV Apartments – Aerial Photos – June 2014

The latest aerial images of the LIV Apartments show the accelerated pace at which the wood framing is being constructed.  The west building framing is complete and work has begun on the south building as progress with framing starts to spread across the site as the structural concrete work is completed for the first phase of the project. The footprint of the north building is starting to emerge as the last post tensioned deck has been completed.  Nearby, the windows of...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update – May 2014

During May, new heights were reached at the site of the ongoing LIV Apartments.  The most visual of the progress made in May is the west building.  Framing continued and reached level 5 of the 6 level building. Adjacent to the west building, the south building has also entered the framing stage.  Work has started with the exterior walls of level 4, and will then transition to interior walls, and the exterior walls of level 3.  In this instance it is...