Capitol Hill Apartments – Construction Update – October

Apartment, Capitol Hill, construction, Construction Update, Grouparchitect, in progress, Multifamily, Seattle | Comments Off on Capitol Hill Apartments – Construction Update – October

The Capitol Hill Apartments construction team has completed the exterior framing.  Pedestrians are now able to visualize the upcoming structure.  The building’s penthouse level butterfly roof adds a recognizable angular skyline to the neighborhood.The structure is located atop a hill which allows for sweeping views out towards Lake Washington, the Cascade Mountains, and the local […]

4
Sep

Capitol Hill Apartments – Construction Update – September

Apartment, Capitol Hill, Construction Update, Grouparchitect, in progress, Seattle | Comments Off on Capitol Hill Apartments – Construction Update – September

The construction process for Capitol Hill is coming along, we are taking advantage of the sunny weather in Seattle.  The framing and sheathing was just completed on the third floor, and we had our first peak at the amazing views toward Lake Washington on the deck of level four.  The team will soon begin framing […]

3
Jul

Plateau 120 Rendering Update

Grouparchitect, in progress, Multi-family/Mixed Use, Renderings, Residential, Sammamish, UZDP | Comments Off on Plateau 120 Rendering Update

Plateau 120 is in the midst of design development, there have been a few schematic changes since our last update on the multifamily project. Plateau 120 is a 92-unit apartment building containing 18 affordable housing units and over 14,425 sq ft of retail / office space at the ground level.Adjacent to 228th Avenue and a […]

26
Jun

LIV Apartments – Aerial Photos – June

Aerial Photos, Bellevue, Uncategorized | Comments Off on LIV Apartments – Aerial Photos – June

The LIV Apartments have applied the final exterior finishes including Hardi and cedar plank siding with metal panel and brick veneer siding as well. The rest of the roof gardens have been implemented and the main entrance has now been completed and tenants have moved into the building. The roof gardens contain, open community deck […]

16
Jun

LIV-Construction Update-June

Apartment, Bellevue, construction, Construction Update, Grouparchitect, in progress, Uncategorized | Comments Off on LIV-Construction Update-June

The LIV Apartments is almost ready to welcome new occupants this July!  The majority of the remaining project’s amenity spaces and landscaping have been completed, including the planters, pavement designs, roof decks, lounges, and many other features.The accent siding at the gateway entrance has been completed and landscaping is underway. The main walking path to […]

29
May

LIV Apartments – Aerial Photos – May

Aerial Photos, Apartment, construction, in progress, LIV Apartments, Project Update, Residential | Comments Off on LIV Apartments – Aerial Photos – May

The LIV Apartment is complete with the exterior framing and sheathing, the final exterior finishes will be applied during these next few weeks. We are excited and working hard to finish the West Building in preparation of new tenants in the month of July. The construction teams will continue to work on the remaining buildings.The outdoor […]

26
May

LIV Apartments – Construction Update Mid May 2015

Apartment, construction, in progress, LIV Apartments, Multi-family/Mixed Use, Project Update, Residential | Comments Off on LIV Apartments – Construction Update Mid May 2015

The West Building of the LIV Apartments is ready for occupants in July which is right around the corner. The construction team has been putting the final touches on the West Building’s units and amenity spaces. Construction will continue on the East, West, and South buildings. The vast majority of the exterior for the North, […]

15
May

Capitol Hill Apartments – Construction Update – April

Capitol Hill, Capitol Hill Apartments, Construction Update, in progress, Multifamily, Post Tension Slab, Residential, Seattle | Comments Off on Capitol Hill Apartments – Construction Update – April

Our Capitol Hill Apartment complex has made a lot of progress since our last update.  Our design team was able to go down to the site to witness the construction process and document the project’s progress over a couple weeks.The foundation work is complete and the lower level is beginning to take form.  The foundation walls […]

30
Apr

LIV Apartments – Construction Update Mid April 2015

construction, in progress, LIV Apartments, Multi-family/Mixed Use, Project Update, Residential | Comments Off on LIV Apartments – Construction Update Mid April 2015

The LIV Apartments is an ongoing multi-family project in Bellevue. This month the landscape components are starting to take form. The main plaza has corten steel planters lining the pedestrian path towards the main entry. The corten steel planters are a reoccurring element throughout the public gathering areas.The upper deck can be accessed from the […]

24
Apr

LIV Apartment – Aerial Photos – April

Aerial Photos, Apartment, construction, in progress, LIV Apartments, Project Update, Residential | Comments Off on LIV Apartment – Aerial Photos – April

We have made a lot of progress at the LIV Apartment construction site. The exterior of the East Building is near completion. The East Building has the windows installed and is currently being wrapped with a weather protective membrane. The construction team will begin installing the concrete pavers and landscape to the roof decks, which […]

3
Apr

Phinney Ridge Prefab – On Site Construction

construction, Custom home, in progress, Method Homes, Modular, Phinney Ridge, Prefab, Project Update, Residential, Seattle | Comments Off on Phinney Ridge Prefab – On Site Construction

The Phinney Ridge pre-fab home has seen a lot of changes over the past 2 months. Since our last update the rest of the fiber cement boards were placed on the front façade of the home. Construction of the front porch has begun, the framing, roof, and railings are in place. The driveway and retaining walls […]

27
Mar

Phinney Ridge Modular Construction Time Lapse

construction, Custom home, in progress, Phinney Ridge, Prefab, Prefab/Modular, Prefabrication, Project Update, Residential, Seattle, Time lapse | Comments Off on Phinney Ridge Modular Construction Time Lapse

The prefab collaboration with Method homes was pieced together in the Phinney Ridge neighborhood of Seattle. This Option series house was custom built over the last few months and it was erected in the month of January 2015. We have documented the process of this prefabricated home in our previous blog posts. The time lapse […]

13
Mar

LIV Apartments – Aerial Photos – March

Aerial Photos, Apartment, construction, in progress, LIV Apartments, Multi-family, Project Update, Residential | Comments Off on LIV Apartments – Aerial Photos – March

Construction has been moving along during the month of March, the exterior framing of the East Building has been completed.  All the windows on the westerly buildings have been installed and the construction team is continuing to wrap the building with the weather protective membrane and continue installation of the building’s cladding systems.Due to the […]

7
Mar

LIV Apartments – Construction Update Mid March 2015

Apartment, construction, in progress, LIV Apartments, Multi-family/Mixed Use, Project Update, Residential | Comments Off on LIV Apartments – Construction Update Mid March 2015

The exterior shells of the North, South, East and West buildings were completed.  As you can see in the image above, the North Building’s building wrap is being applied against the sheathing.  It will soon look similar to the South Building, shown on the right, with the exterior finishes installed and painted. The corten steel […]

6
Feb

LIV Apartments – AERIAL PHOTOS – Feb.

Aerial Photos, Apartment, Construction, In Progress, LIV Apartments, Project Update, Residential, Uncategorized, update | Comments Off on LIV Apartments – AERIAL PHOTOS – Feb.

Construction at the LIV Apartments in Bellevue has made substantial progress in the recent month.  The East building has reached level 6 of framing and flooring including roof trusses.  The framing of the lower roof deck amenity space on the 5th level is complete and the green roof, concrete pavers, dog run, planters, and trees […]

10
Jan

Capitol Hill Apartments – Construction Update – January

Apartment, Capitol Hill, construction, in progress, Residential, update | Comments Off on Capitol Hill Apartments – Construction Update – January

Our Capitol Hill Apartment project has been progressing through the wet season.  The construction team has been busy with the foundation forms now that shoring has been installed.  The reinforcing rebar can be seen protruding from the completed concrete footings.  The columns are due to be poured later this week, followed by the perimeter foundation […]

2
Jan

Phinney Ridge Prefab – Module Set

Exciting news on the Pre-fab home front here at Grouparchitect!  The latest collaboration with Method homes is taking shape in the Phinney Ridge neighborhood of Seattle.  This Option series house has been in the works for the last few months, and as detailed in previous blog posts progress has been continuing steadily.  The most exciting part […]

28
Nov

Capitol Hill Apartments

Apartment, Breaking ground, Capitol Hill, Construction, In Progress, Residential | Comments Off on Capitol Hill Apartments

Grouparchitect is working with Rudd Development to build a new 34 unit apartment complex in Capitol Hill near Capitol Hill Family Health Clinic.  The eclectic neighborhood is rich with low rise residential buildings; and the design of the Capitol Hill Apartments reflects the density, diversity and ambiance of the neighborhood. Construction began in September with […]

21
Nov

Phinney Ridge Prefab – Construction

Construction, Custom home, In Progress, Phinney Ridge, Prefab, Residential | Comments Off on Phinney Ridge Prefab – Construction

The Phinney Ridge project is a single-family, prefab house. Since our last update we have seen a few changes regarding the site and house. The framework for the foundation was built and the concrete was poured. The site is prepared for the prefab house to be dropped in. One of the benefits of prefabrication is […]

13
Aug

Alaskan Copper Works – Early August Construction Update

Construction, fabrication, In Progress, Industrial, manufacturing | Comments Off on Alaskan Copper Works – Early August Construction Update

Adding to our industrial work portfolio, our ongoing project with local manufacturer Alaskan Copper Works exhibits a construction type not often undertaken in this office.  We at Grouparchitect welcome the opportunity to work on various project and construction types, and administering the construction of this addition onto an existing factory in SODO has been exciting. […]