The Mercantile – Construction Progress – June 2016

Apartment, Bothell, construction, framing, Multifamily, progress, The Mercantile | Comments Off on The Mercantile – Construction Progress – June 2016

Level 3’s PT slab was poured earlier this month, allowing the wood framing construction to begin. There is a 2 story elevation change from the west side of the property, off of 102nd Ave NE, to the east side of the property.  The topography meets the third floor on the east end of the building, […]

23
May

The Mercantile – Construction Progress – May 2016

Apartment, Bothell, construction, Multifamily, Residential, The Merc, The Mercantile | Comments Off on The Mercantile – Construction Progress – May 2016

The Level 3 post-tension slab is being laid out this week.  The back of the structure is beginning to emerge above ground.The supporting deck is assembled with some shoring along the edges.The concrete walls’ framework and shoring is occupying majority of floor space on site.  The image on the left displays where the new construction […]

22
Mar

The Mercantile – Construction Progress – March 2016

Apartment, Bothell, Breaking ground, construction, foundation, Multifamily, progress, Residential, The Merc, The Mercantile | Comments Off on The Mercantile – Construction Progress – March 2016

Over the past couple weeks the construction team has been pouring the remaining columns of the subgrade garage. The foundation and footings are complete and the second level PT slab will be poured in the next couple weeks.Keep updated with the Mercantile project by clicking here.

29
Feb

The Mercantile – Construction Progress – February 2016

Apartment, Bothell, Breaking ground, construction, Demo, Demolition, Multifamily, Residential, The Merc, The Mercantile | Comments Off on The Mercantile – Construction Progress – February 2016

The Mercantile is starting to take form.  The footings were completed and the columns are being erected at the lower levels.  The construction teams are proceeding to build the concrete garage walls and mapping the plumbing where pipes will puncture through concrete floor slabs and walls.We are excited to see the next steps for The […]

1
Dec

TDX Renovation – Construction Update – November 2015

A building rich in history, this project has been broken up into phases.  We’ve completed the exterior work and have been updating the interior.  Some of the updates include improvements to the laundry room, renovating the main floor restroom and bringing new life to the portico room. Not taking away from the integrity of the […]

23
Nov

The Mercantile – Construction Progress – November 2015

Apartment, Bothell, Breaking ground, construction, Demo, Demolition, Multifamily, Residential, The Merc, The Mercantile | Comments Off on The Mercantile – Construction Progress – November 2015

The Mercantile will be a seven story multifamily apartment building.  The demolition phase has begun in the month of October.  The original building, the Cooperative Mercantile Company, is an unreinforced masonry structure.  The demolition team has been working to preserve the existing brick façade, which will be incorporated into the new design. The windows and […]

9
Nov

Lake Forest Remodel

This rambler, located on a large secluded lot, became the focus of a number of updates to the existing infrastructure. The kitchen and family rooms were updated with modern finishes and the laundry room has been expanded to include dog washing amenities and extra storage. In the bedroom wing, the bathrooms will see a complete […]

19
Oct

Lane Apartments Design Review

Located in the heart of the Northgate Neighborhood, the Lane on fifth Apartments will feature 215 market rate apartments in addition to ground level retail uses.  The project is anchored by a strong retail presence beside the emerging pedestrian streetscape of 5th Avenue NE and generous outdoor amenity spaces including roof deck terraces and a […]

28
Sep

Capitol Hill Remodel – Construction Update

Capitol Hill, construction, Kitchen, Remodel, Renovation, Residential, Seattle, update | Comments Off on Capitol Hill Remodel – Construction Update

Improvements include updating and repairing the exterior with a new modern façade with durable materials over a rainscreen system, enclosing a covered porch, window and door replacements, a new kitchen and updated finishes and fixtures in the home’s bathroom. The construction team has been proficiently working through the summer to complete the exterior work before […]

18
Sep

The Mercantile – Breaking Ground

Apartment, Bothell, Breaking ground, construction, Multifamily, rendering, Residential, The Merc, The Mercantile | Comments Off on The Mercantile – Breaking Ground

We are excited to break ground and start construction on The Mercantile, a six story multifamily apartment building, located in the heart of downtown Bothell at the corner of 102nd & Main. The Mercantile will blend the old with new. Originally the site of the Cooperative Mercantile Company’s first building, ca 1908, the new structure will […]

11
Sep

Venice Beach Completion

California, Grouparchitect, Method Homes, Modular, Prefab, Prefab/Modular, Residential, Venice Beach | Comments Off on Venice Beach Completion

The Venice beach prefab is a two-story 2,300 sf house designed in modules. The components were fabricated offsite and shipped to the homeowner’s property in Venice beach, California. Grouparchitect was engaged to provide modular design consulting and architectural renderings.The upstairs has a breezeway that connects the bedrooms to the outdoor deck, due to California’s constant […]

4
Sep

Capitol Hill Apartments – Construction Update – September

Apartment, Capitol Hill, Construction Update, Grouparchitect, in progress, Seattle | Comments Off on Capitol Hill Apartments – Construction Update – September

The construction process for Capitol Hill is coming along, we are taking advantage of the sunny weather in Seattle.  The framing and sheathing was just completed on the third floor, and we had our first peak at the amazing views toward Lake Washington on the deck of level four.  The team will soon begin framing […]

14
Aug

Leilani Completion

Grouparchitect, Multi-family/Mixed Use, Residential | Comments Off on Leilani Completion

Leilani Apartments adapted its name from the site’s previous occupant, the Leilani Lanes bowling alley.  The large site is bounded by a wide range of adjacent uses and scales, necessitating a multiple-building response to reduce bulk and scale as well as to provide ground level open space.  The project was completed in 2013 and has […]

7
Aug

Ravenna Option 3.2 Completion

Grouparchitect, Home Design, Interior Design, Modular, Prefab, Prefab, Prefab/Modular, Prefabrication, Seattle | Comments Off on Ravenna Option 3.2 Completion

This prefab residence is one of the option series Grouparchitect collaborated with Method Homes.  This home  was customized to meet the needs of the homeowners and their unique site.  It is located within Seattle’s Ravenna neighborhood.  This modular home has (3) bedrooms, (3) bathrooms, spacious living spaces, and a garage and den space partially below […]

31
Jul

Lake Sammamish Remodel Completion

This project was a remodel to the existing kitchen of a Lake Sammaish residence. The original home is classic mid-century kitchen renovated into a modern space with clean lines. This gave way to open the floor plan to connect the living room, dinging and kitchen. The Pental Quartz counter space organized the occupied area gracefully with […]

15
Jul

Capitol Hill Construction-Update-July

Progress on our Capitol Hill Apartment is coming along. These past few weeks, the concrete level and PT deck have been placed and cured making way to start the framing process. Framing for Level 2 above the PT concrete deck is underway and it is awaiting the joist construction for the Level 3 floor deck.Window studs […]

10
Jul

Phinney Ridge Completion

This project for Phinney Ridge Prefab was the first of the option series, a line of prefabricated modular homes, built in Seattle by Method Homes. This option home series was customized to meet the owner’s needs for a three bedroom plus den, three and a half bath home. Built on a tight urban lot, this […]

3
Jul

Plateau 120 Rendering Update

Grouparchitect, in progress, Multi-family/Mixed Use, Renderings, Residential, Sammamish, UZDP | Comments Off on Plateau 120 Rendering Update

Plateau 120 is in the midst of design development, there have been a few schematic changes since our last update on the multifamily project. Plateau 120 is a 92-unit apartment building containing 18 affordable housing units and over 14,425 sq ft of retail / office space at the ground level.Adjacent to 228th Avenue and a […]

19
Jun

Clyde Hill Remodel Completion

This project was a custom remodel to an existing home in Clyde Hill.  The original home was a traditional brick house with a similar shingled, pitched roof.  The home’s interior and exterior was completely revamped. A new courtyard and water feature adorn the remodeled vaulted entry and window wall.  The large cantilevering entrance provides coverage […]

5
Jun

SheKnows Blog – May 2015

Blog, Custom home, Feature, Landscaping, Residential, SheKnows | Comments Off on SheKnows Blog – May 2015

One of our projects was recently mentioned in a lifestyle article.  SheKnows is an entertainment blog with a section dedicated towards architectural design that identifies notable projects and ideas. This particular article addressed the effectiveness of utilizing landscape to increase a home’s curb appeal. The project mentioned in the article was a new single family […]