Phinney Ridge Prefab – Construction

Construction, Custom home, In Progress, Phinney Ridge, Prefab, Residential | Comments Off on Phinney Ridge Prefab – Construction

The Phinney Ridge project is a single-family, prefab house. Since our last update we have seen a few changes regarding the site and house. The framework for the foundation was built and the concrete was poured. The site is prepared for the prefab house to be dropped in. One of the benefits of prefabrication is […]

20
Nov

LIV Apartments – Aerial Photos – Nov.

Aerial Photos, Construction, In Progress, LIV Apartments, Multi-family/Mixed Use, Residential | Comments Off on LIV Apartments – Aerial Photos – Nov.

The progress thus far during the month November at the LIV Apartments job site shows progress on all avenues.  The North Building topped out last month so efforts have now shifted to waterproofing.  The white TPO roofing membrane has been added and work is now focused on waterproofing exterior openings such as windows and doors. […]

7
Nov

LIV Apartments – Construction Update – October

Construction, In Progress, LIV Apartments, Multi-family/Mixed Use, Residential | Comments Off on LIV Apartments – Construction Update – October

There has been lots of recent progress on our LIV apartments project over the month of October located in Bellevue.   You can see the West building towering over the beginning stages of the East building.  This addition is the final component to this mix-use complex.  Phase 2 is moving along swiftly, with concrete and elevated […]

29
Oct

TDX Renovation – November Update

The Theta Delta Chi fraternity building has undergone some serious remodeling.  There has been a lot of progress to the courtyard and rear of the building over the last couple of months.  But now it’s time to renovate the original building.  The exterior was retrieved to its historic state, with Ionic columns supporting the portico […]

22
Oct

LIV Apartments – Aerial Photos – Oct.

Construction, Grouparchitect, In Progress, LIV Apartments, Multi-family/Mixed Use, Residential | Comments Off on LIV Apartments – Aerial Photos – Oct.

October at the LIV Apartments was a busy month.  The most notable progress on site over the last month would probably be the framing of the North Building, which topped out at its highest point.  This signals the completion of the framing for phase 1 of the project.  The roof and waterproofing will soon follow […]

15
Oct

Phinney Ridge Prefab – Factory Visit

Construction, Custom home, In Progress, Prefab, Prefab/Modular, Residential | Comments Off on Phinney Ridge Prefab – Factory Visit

As progress at the Phinney Ridge Prefab project site continues since the demolition of the existing home, ongoing efforts on the home continues at the Method Homes factory in Ferndale, WA. Prefabrication of this home allows for a significantly reduced construction schedule, and also helps considerably for projects that are to be constructed in the […]

6
Oct

LIV Apartments – Construction Update – September

Construction, Grouparchitect, In Progress, LIV Apartments, Multi-family/Mixed Use, Phasing, Residential | Comments Off on LIV Apartments – Construction Update – September

September at the LIV Apartments was a busy month.  Trades worked on all aspects of the project from exterior cladding detailing and painting to interior gypsum board and work on unit interiors.  At the West Building, the gateway feature wall takes shape as the composite wood panels are installed and frame the western entrance to […]

3
Oct

Phinney Ridge Prefab – Demo

Construction, Custom home, In Progress, Prefab, Prefab/Modular, Residential | Comments Off on Phinney Ridge Prefab – Demo

The excavator is in the process of demolition of the existing home at the site of the new Phinney Ridge Prefab home project being careful for the neighboring homes and fences. Homes are no match for an excavator, also known as a track hoe.  The long reach of the boom and bucket is able to […]

1
Oct

TDX Renovation – September Update

Construction, In Progress, Multi-family/Mixed Use, Remodeling, Residential | Comments Off on TDX Renovation – September Update

The Theta Delta Chi renovation at the University of Washington continues as work on the roof, cladding, and window replacement progresses.  Additional structural members were required to take the load where the aging trusses have rotted and can no longer perform to their structural rating.  On top of the new roof structure, an almost completely […]

26
Sep

LIV Apartments – Aerial Photos – Sept

Aerial Photos, Construction, Grouparchitect, In Progress, Multi-family/Mixed Use, Residential, Uncategorized | Comments Off on LIV Apartments – Aerial Photos – Sept

The month of September brought progress across all areas of the LIV Apartments in Bellevue.  The South Building roof has been installed and progress continues on the window and exterior siding installation.  Interior plumbing and electrical rough in proceed in conjunction to maximize the potential of scheduling trades. Elsewhere, at the West Building, painters have […]

17
Sep

Phinney Ridge Prefab

Construction, Custom home, In Progress, Prefab, Prefab, Prefab/Modular, Residential | Comments Off on Phinney Ridge Prefab

The Phinney Ridge Prefab project will soon kick off as plans have been approved by the city and contracts signed for construction.  This new house will be built using pre-fab techniques utilizing the Grouparchitect designed Option Series offered in partnership with Method Homes. The existing home’s concrete block foundation was in poor condition and repair […]

10
Sep

LIV Apartments – West Gateway

Construction, In Progress, Multi-family/Mixed Use, Residential | Comments Off on LIV Apartments – West Gateway

Original post 05/23/2014 As framing progresses at the LIV Apartments, a major design feature of the project is starting to take shape.  The “gateway” entrance off Bel-red Road is adorned with two story feature walls on both the North and West buildings, with the West building wall framing now ready to receive exterior sheathing. These walls […]

5
Sep

LIV Apartments – Construction Update – August

Construction, Grouparchitect, In Progress, Multi-family/Mixed Use, Residential | Comments Off on LIV Apartments – Construction Update – August

The month of August brought advances to several areas of construction at the LIV Apartments in Bellevue.  Framing across the site continues upward as crews race to beat the oncoming fall weather. The North Building, the largest of the buildings, framing reached to level five of eight.  Construction speed was increased on the project by […]

1
Sep

TDX Renovation – August Update

Construction, In Progress, Multi-family/Mixed Use, Remodeling, Residential, Uncategorized | Comments Off on TDX Renovation – August Update

The renovation of Theta Delta Chi at the University of Washington is well underway as work continues on the roof and portico of this historic building.  The rotten wood shown in the previous post has been removed and new framing and decking serve as a solid base for the waterproofing to soon be installed. Demolition […]

26
Aug

LIV Apartments – Aerial Photos – August

Aerial Photos, Construction, Grouparchitect, In Progress, Multi-family/Mixed Use, Residential | Comments Off on LIV Apartments – Aerial Photos – August

Since the previous LIV Apartments aerial update last month, the progress on the three phase 1 buildings has continued, and construction broke ground on the East building.  The second phase of the project will include 99 residential units, several large amenity spaces, and two large roof decks. Elsewhere on site progress continues at a fever […]

7
Aug

Laurelhurst Residence – Wine Room

Progress on the Laurelhurst Residence Wine Room progressed quickly once the framing was completed.  Carpenters fabricated several wine racks designed to fit into the various niches and nooks that resulted from tucking the wine room into a difficult corner of the home.  The raw wood of the racks compliment the natural slate floor, and when […]

5
Aug

LIV Apartments – Construction Update – July

Construction, Grouparchitect, In Progress, Materials, Multi-family/Mixed Use, Phasing, Residential | Comments Off on LIV Apartments – Construction Update – July

Construction progress at the LIV Apartments job site has made substantial progress during the month of July, including the groundbreaking of the second phase of the project. The South building continues framing up to level 7 and will soon start the 8th floor wood framing.  Metal decks and exterior work continues the efforts towards topping […]

4
Aug

Clyde Hill – Construction Update – July

Construction, Custom home, Finishes, In Progress, Kitchens, Master Bedroom, Materials, Products, Remodeling, Residential | Comments Off on Clyde Hill – Construction Update – July

The efforts for completing the Clyde Hill Residence renovation have shifted to the interior during the month of July as painting, staining, and finishing details are completed. The light finish of the cabinetry, along with the white paint and abundance of windows throughout the house keeps the home bright and cheerful during all hours of the […]

1
Aug

TDX Renovation work begins

Commercial, Construction, In Progress, Multi-family/Mixed Use, Phasing, Remodeling, Residential, Seattle | Comments Off on TDX Renovation work begins

Construction is now underway on the renovation of Theta Delta Chi at the University of Washington. Work is beginning on the portico deck. Improvements to this portion of the building will include rot and damage repair, repairing of the columns & capitals, railing repair, a new waterproof deck, and improved access to the deck. Additional […]

25
Jul

LIV Apartments – Aerial Photos – July

Construction, In Progress, Multi-family/Mixed Use | Comments Off on LIV Apartments – Aerial Photos – July

The LIV Apartments progress continues into July as framing has started on the north building’s level 3 and framing has progressed to level 7 of the south building.  Panels and other materials have begun to be staged on the top post tensioned level of the north building as framing on level 4 will soon begin.Covered […]