Ravenna Option 3.2 Completion

This prefab residence is one of the option series Grouparchitect collaborated with Method Homes.  This home  was customized to meet the needs of the homeowners and their unique site.  It is located within Seattle’s Ravenna neighborhood.  This modular home has (3) bedrooms, (3) bathrooms, spacious living spaces, and a garage and den space partially below grade.The main floor contains custom bench seating and an open living space with bedrooms to the back of the house.The modern and vibrant interior was...

Lake Sammamish Remodel Completion

This project was a remodel to the existing kitchen of a Lake Sammaish residence. The original home is classic mid-century kitchen renovated into a modern space with clean lines. This gave way to open the floor plan to connect the living room, dinging and kitchen. The Pental Quartz counter space organized the occupied area gracefully with an operable stove hood by Miele, adjustable to see the Lake Sammamish view.The kitchen has accessibility to the back porch and has two options of...

Capitol Hill Construction-Update-July

Progress on our Capitol Hill Apartment is coming along. These past few weeks, the concrete level and PT deck have been placed and cured making way to start the framing process. Framing for Level 2 above the PT concrete deck is underway and it is awaiting the joist construction for the Level 3 floor deck.Window studs are being implemented and it is awaiting the joist construction for the next floor system....

Phinney Ridge Completion

This project for Phinney Ridge Prefab was the first of the option series, a line of prefabricated modular homes, built in Seattle by Method Homes. This option home series was customized to meet the owner’s needs for a three bedroom plus den, three and a half bath home. Built on a tight urban lot, this home feature a rooftop desk that is provided to catch the territorial views of Green Lake and Mount Rainier.The interiors are clean and modern with...

Plateau 120 Rendering Update

Plateau 120 is in the midst of design development, there have been a few schematic changes since our last update on the multifamily project. Plateau 120 is a 92-unit apartment building containing 18 affordable housing units and over 14,425 sq ft of retail / office space at the ground level.Adjacent to 228th Avenue and a City of Sammamish drainage pond and a non-fish bearing stream, the western side of the project features close to 10,000 square feet of open space,...

Clyde Hill Remodel Completion

This project was a custom remodel to an existing home in Clyde Hill.  The original home was a traditional brick house with a similar shingled, pitched roof.  The home’s interior and exterior was completely revamped. A new courtyard and water feature adorn the remodeled vaulted entry and window wall.  The large cantilevering entrance provides coverage and a focal point. The exterior horizontal wood siding continues on the ceiling of the main entrance. Inside, the revised design features a large great room and...

SheKnows Blog – May 2015

One of our projects was recently mentioned in a lifestyle article.  SheKnows is an entertainment blog with a section dedicated towards architectural design that identifies notable projects and ideas. This particular article addressed the effectiveness of utilizing landscape to increase a home’s curb appeal. The project mentioned in the article was a new single family home located in Laurelhurst.  Grouparchitect strives to design with cohesion between a home and its site.  We are pleased to have the project recognized for its complementary...

LIV Apartments – Aerial Photos – May

The LIV Apartment is complete with the exterior framing and sheathing, the final exterior finishes will be applied during these next few weeks. We are excited and working hard to finish the West Building in preparation of new tenants in the month of July. The construction teams will continue to work on the remaining buildings.The outdoor spaces are beginning to take form and are vibrant with vegetation. The upper decks have trees planted in the corten steel planters and the roof...

LIV Apartments – Construction Update Mid May 2015

The West Building of the LIV Apartments is ready for occupants in July which is right around the corner. The construction team has been putting the final touches on the West Building’s units and amenity spaces. Construction will continue on the East, West, and South buildings. The vast majority of the exterior for the North, South, and West buildings are sheathed, wrapped, and finished. The image on the right displays the pavers that will soon be installed on the upper decks...

Capitol Hill Apartments – Construction Update – April

Our Capitol Hill Apartment complex has made a lot of progress since our last update.  Our design team was able to go down to the site to witness the construction process and document the project’s progress over a couple weeks.The foundation work is complete and the lower level is beginning to take form.  The foundation walls and columns for the first level was completed and the support shoring for the podium level is being laid down in this photograph prior to...