The Mercantile – Construction Progress – May 2016

Apartment, Bothell, construction, Multifamily, Residential, The Merc, The Mercantile | Comments Off on The Mercantile – Construction Progress – May 2016

The Level 3 post-tension slab is being laid out this week.  The back of the structure is beginning to emerge above ground.The supporting deck is assembled with some shoring along the edges.The concrete walls’ framework and shoring is occupying majority of floor space on site.  The image on the left displays where the new construction […]

18
Apr

The Mercantile – Construction Progress – April 2016

Apartment, Bothell, construction, Multifamily, progress, pt slab, slab on grade, The Mercantile | Comments Off on The Mercantile – Construction Progress – April 2016

The slab on grade is complete on the Mercantile site, located in Bothell.  The concrete columns are erected at the ground level.  Soon after, the level 2 deck was prepped for a concrete pour.The forms were constructed and lined with reinforced bars and ties, as illustrated in the image below.  The formwork for the concrete […]