Seattle, WA
Second in a phased remodel based on a master plan remodel design, this remodel added a large dormer addition to add a new primary suite with walk-in-closet and ensuite bath as well as a laundry room and a fourth bedroom with its own ensuite bath. The laundry room included space for small home office and door opening up to a juliet balcony to provide access to move in large furniture that couldn’t be navigated up the existing narrow stair. In the prior remodel of the main floor, drain lines and utilities were roughed in for this further addition to not require opening up the ceiling of the main level.
Grouparchitect Team: Scott LaBenz AIA, Emily McNichols AIA
Contractor: Heartwood Builders
Structural Engineer: Fossatti Pawlak Structural Engineers