LIV Apartments – Aerial Photos – June

The LIV Apartments have applied the final exterior finishes including Hardi and cedar plank siding with metal panel and brick veneer siding as well. The rest of the roof gardens have been implemented and the main entrance has now been completed and tenants have moved into the building. The roof gardens contain, open community deck lounge and roof planters. The courtyard also will be including similar features that the roof spaces will have; corten steel planters and precast concrete bench...

LIV Apartments – Aerial Photos – May

The LIV Apartment is complete with the exterior framing and sheathing, the final exterior finishes will be applied during these next few weeks. We are excited and working hard to finish the West Building in preparation of new tenants in the month of July. The construction teams will continue to work on the remaining buildings.The outdoor spaces are beginning to take form and are vibrant with vegetation. The upper decks have trees planted in the corten steel planters and the roof...

LIV Apartment – Aerial Photos – April

We have made a lot of progress at the LIV Apartment construction site. The exterior of the East Building is near completion. The East Building has the windows installed and is currently being wrapped with a weather protective membrane. The construction team will begin installing the concrete pavers and landscape to the roof decks, which will be complete with a green roof, dog run, planters, and trees. The South Building’s lower deck is taking form with cast in place benches and...

LIV Apartments – Aerial Photos – March

Construction has been moving along during the month of March, the exterior framing of the East Building has been completed.  All the windows on the westerly buildings have been installed and the construction team is continuing to wrap the building with the weather protective membrane and continue installation of the building’s cladding systems.Due to the great weather exterior work such as painting, cladding, and site work have been accelerated accordingly. The landscaping and construction team has been busy applying finishes...

LIV Apartments – AERIAL PHOTOS – Feb.

Construction at the LIV Apartments in Bellevue has made substantial progress in the recent month.  The East building has reached level 6 of framing and flooring including roof trusses.  The framing of the lower roof deck amenity space on the 5th level is complete and the green roof, concrete pavers, dog run, planters, and trees will be installed next. The large crane previously located in the center of the plaza was removed as the North, South, and West buildings are nearing...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – Jan.

January has been a productive month at the LIV Apartments in Bellevue.  Progress on the East Building has reached level 5 as framing crews continue to install wall panels and flooring.  Seen in the photo above, crews are framing a lowered roof deck amenity space that will soon be covered with green roof, concrete pavers, a dog run, planters, and trees.  This East Building will have one more level of apartments and amenity spaces before the roof trusses cap the...

LIV Apartments – Aerial Photos – Nov.

The progress thus far during the month November at the LIV Apartments job site shows progress on all avenues.  The North Building topped out last month so efforts have now shifted to waterproofing.  The white TPO roofing membrane has been added and work is now focused on waterproofing exterior openings such as windows and doors. In October, the East building – also known as Phase 2, was preparing for the pour of the second level post tensioned concrete deck. Progress since...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – Sept

The month of September brought progress across all areas of the LIV Apartments in Bellevue.  The South Building roof has been installed and progress continues on the window and exterior siding installation.  Interior plumbing and electrical rough in proceed in conjunction to maximize the potential of scheduling trades. Elsewhere, at the West Building, painters have begun to paint the exterior fiber cement board as the installation of the composite wood panel, metal panel, and brick masonry has nearly finished. The North Building...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – August

Since the previous LIV Apartments aerial update last month, the progress on the three phase 1 buildings has continued, and construction broke ground on the East building.  The second phase of the project will include 99 residential units, several large amenity spaces, and two large roof decks. Elsewhere on site progress continues at a fever pitch.  The most notable progress as seen from the air would be the progress on the North Building framing.  Framing work is now continuing on level...