LIV Apartments – Aerial Photos – June

The LIV Apartments have applied the final exterior finishes including Hardi and cedar plank siding with metal panel and brick veneer siding as well. The rest of the roof gardens have been implemented and the main entrance has now been completed and tenants have moved into the building. The roof gardens contain, open community deck lounge and roof planters. The courtyard also will be including similar features that the roof spaces will have; corten steel planters and precast concrete bench...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – Jan.

January has been a productive month at the LIV Apartments in Bellevue.  Progress on the East Building has reached level 5 as framing crews continue to install wall panels and flooring.  Seen in the photo above, crews are framing a lowered roof deck amenity space that will soon be covered with green roof, concrete pavers, a dog run, planters, and trees.  This East Building will have one more level of apartments and amenity spaces before the roof trusses cap the...

LIV Apartments – Aerial Photos – Dec.

December has been a busy month at the LIV Apartments.  Progress on the East Building has reached level 3 as framing crews install wall panels and flooring.  This panelized method of installing wall panels is the quickest way of getting a building of this type constructed.  On average, framing crews can install an entire level of wall panels and floors in a good week.  By the time the January 2015 aerial update is posted it is entirely possible that the...

LIV Apartments – Aerial Photos – Nov.

The progress thus far during the month November at the LIV Apartments job site shows progress on all avenues.  The North Building topped out last month so efforts have now shifted to waterproofing.  The white TPO roofing membrane has been added and work is now focused on waterproofing exterior openings such as windows and doors. In October, the East building – also known as Phase 2, was preparing for the pour of the second level post tensioned concrete deck. Progress since...

LIV Apartments – Aerial Photos – Oct.

October at the LIV Apartments was a busy month.  The most notable progress on site over the last month would probably be the framing of the North Building, which topped out at its highest point.  This signals the completion of the framing for phase 1 of the project.  The roof and waterproofing will soon follow in an effort to minimize the exposure to the moist fall weather. The East Building, adjacent to 156th Ave NE, underwent a quick transition as subsurface...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – Sept

The month of September brought progress across all areas of the LIV Apartments in Bellevue.  The South Building roof has been installed and progress continues on the window and exterior siding installation.  Interior plumbing and electrical rough in proceed in conjunction to maximize the potential of scheduling trades. Elsewhere, at the West Building, painters have begun to paint the exterior fiber cement board as the installation of the composite wood panel, metal panel, and brick masonry has nearly finished. The North Building...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – August

Since the previous LIV Apartments aerial update last month, the progress on the three phase 1 buildings has continued, and construction broke ground on the East building.  The second phase of the project will include 99 residential units, several large amenity spaces, and two large roof decks. Elsewhere on site progress continues at a fever pitch.  The most notable progress as seen from the air would be the progress on the North Building framing.  Framing work is now continuing on level...

LIV Apartments – Aerial Photos – July

The LIV Apartments progress continues into July as framing has started on the north building’s level 3 and framing has progressed to level 7 of the south building.  Panels and other materials have begun to be staged on the top post tensioned level of the north building as framing on level 4 will soon begin.Covered in a new high albedo roof, the west building officially topped out and efforts have now shifted towards waterproofing the exterior and installing windows. The...

LIV Apartments – Aerial Photos – June 2014

The latest aerial images of the LIV Apartments show the accelerated pace at which the wood framing is being constructed.  The west building framing is complete and work has begun on the south building as progress with framing starts to spread across the site as the structural concrete work is completed for the first phase of the project. The footprint of the north building is starting to emerge as the last post tensioned deck has been completed.  Nearby, the windows of...

LIV Apartments – Aerial Views – May 2014

The latest aerial images of the LIV Apartments have arrived and progress continues onward and upward. The post tensioned concrete floors of the south building have defined the buildings’ footprint, and the relationship of the South and West buildings can start to be seen. At the West building, Wood framing at is nearing completion and framing is about begin on the South building. Between these two buildings a new NE 22nd Place will wind its way through the site and...