Capitol Hill Apartments – Construction Update – October

The Capitol Hill Apartments construction team has completed the exterior framing.  Pedestrians are now able to visualize the upcoming structure.  The building’s penthouse level butterfly roof adds a recognizable angular skyline to the neighborhood.The structure is located atop a hill which allows for sweeping views out towards Lake Washington, the Cascade Mountains, and the local territory. The windows are currently being installed, just in time for the autumn rainfall.  The cantilevered floors will provide weather protection from Seattle’s damp weather climate. ...

Capitol Hill Apartments – Construction Update – September

The construction process for Capitol Hill is coming along, we are taking advantage of the sunny weather in Seattle.  The framing and sheathing was just completed on the third floor, and we had our first peak at the amazing views toward Lake Washington on the deck of level four.  The team will soon begin framing the exterior walls of the fourth floor.The picture above shows the entrance into the courtyard.  This elevated stoop will provide a private entry along Denny...

Plateau 120 Rendering Update

Plateau 120 is in the midst of design development, there have been a few schematic changes since our last update on the multifamily project. Plateau 120 is a 92-unit apartment building containing 18 affordable housing units and over 14,425 sq ft of retail / office space at the ground level.Adjacent to 228th Avenue and a City of Sammamish drainage pond and a non-fish bearing stream, the western side of the project features close to 10,000 square feet of open space,...

LIV Apartments – Aerial Photos – June

The LIV Apartments have applied the final exterior finishes including Hardi and cedar plank siding with metal panel and brick veneer siding as well. The rest of the roof gardens have been implemented and the main entrance has now been completed and tenants have moved into the building. The roof gardens contain, open community deck lounge and roof planters. The courtyard also will be including similar features that the roof spaces will have; corten steel planters and precast concrete bench...

LIV-Construction Update-June

The LIV Apartments is almost ready to welcome new occupants this July!  The majority of the remaining project’s amenity spaces and landscaping have been completed, including the planters, pavement designs, roof decks, lounges, and many other features.The accent siding at the gateway entrance has been completed and landscaping is underway. The main walking path to the leasing office and building entry will be completed shortly.The main entrance to the West building is lined with the corten steel planters and walkway...

LIV Apartments – Aerial Photos – May

The LIV Apartment is complete with the exterior framing and sheathing, the final exterior finishes will be applied during these next few weeks. We are excited and working hard to finish the West Building in preparation of new tenants in the month of July. The construction teams will continue to work on the remaining buildings.The outdoor spaces are beginning to take form and are vibrant with vegetation. The upper decks have trees planted in the corten steel planters and the roof...

LIV Apartments – Construction Update Mid May 2015

The West Building of the LIV Apartments is ready for occupants in July which is right around the corner. The construction team has been putting the final touches on the West Building’s units and amenity spaces. Construction will continue on the East, West, and South buildings. The vast majority of the exterior for the North, South, and West buildings are sheathed, wrapped, and finished. The image on the right displays the pavers that will soon be installed on the upper decks...

Capitol Hill Apartments – Construction Update – April

Our Capitol Hill Apartment complex has made a lot of progress since our last update.  Our design team was able to go down to the site to witness the construction process and document the project’s progress over a couple weeks.The foundation work is complete and the lower level is beginning to take form.  The foundation walls and columns for the first level was completed and the support shoring for the podium level is being laid down in this photograph prior to...

LIV Apartments – Construction Update Mid April 2015

The LIV Apartments is an ongoing multi-family project in Bellevue. This month the landscape components are starting to take form. The main plaza has corten steel planters lining the pedestrian path towards the main entry. The corten steel planters are a reoccurring element throughout the public gathering areas.The upper deck can be accessed from the main entry plaza through the prominent elevator, located to the left in the image above.  The elevator opens onto more staggered corten steel planters.  There...

LIV Apartment – Aerial Photos – April

We have made a lot of progress at the LIV Apartment construction site. The exterior of the East Building is near completion. The East Building has the windows installed and is currently being wrapped with a weather protective membrane. The construction team will begin installing the concrete pavers and landscape to the roof decks, which will be complete with a green roof, dog run, planters, and trees. The South Building’s lower deck is taking form with cast in place benches and...