logo
A powerful architecture & Construction theme. Construct your website in the perfect Ratio.
Alienum phaedrum torquatos nec eu, vis detraxit periculis ex, nihil expetendis in mei. Mei an pericula

multifamily Tag

grouparchitect / Posts tagged "multifamily"

The Mercantile – Construction Progress – June 2016

Level 3’s PT slab was poured earlier this month, allowing the wood framing construction to begin. There is a 2 story elevation change from the west side of the property, off of 102nd Ave NE, to the east side of the property.  The topography meets the third floor on the east end of the building, as shown in the image above.The podium’s structure is complete and the tower is taking form. The image on the left shows the framing for...

The Mercantile – Construction Progress – May 2016

The Level 3 post-tension slab is being laid out this week.  The back of the structure is beginning to emerge above ground.The supporting deck is assembled with some shoring along the edges.The concrete walls’ framework and shoring is occupying majority of floor space on site.  The image on the left displays where the new construction meets the old.  A concrete wall will be poured in alignment with the existing masonry wall.Keep updated with the Mercantile project by clicking here....

The Mercantile – Construction Progress – April 2016

The slab on grade is complete on the Mercantile site, located in Bothell.  The concrete columns are erected at the ground level.  Soon after, the level 2 deck was prepped for a concrete pour.The forms were constructed and lined with reinforced bars and ties, as illustrated in the image below.  The formwork for the concrete pour is completely sealed to prevent any leaks or blowouts as the concrete cures. Once the deck shoring is in place, the construction team laid...

The Mercantile – Construction Progress – March 2016

Over the past couple weeks the construction team has been pouring the remaining columns of the subgrade garage. The foundation and footings are complete and the second level PT slab will be poured in the next couple weeks.Keep updated with the Mercantile project by clicking here....

The Mercantile – Construction Progress – February 2016

The Mercantile is starting to take form.  The footings were completed and the columns are being erected at the lower levels.  The construction teams are proceeding to build the concrete garage walls and mapping the plumbing where pipes will puncture through concrete floor slabs and walls.We are excited to see the next steps for The Mercantile, keep track of the construction progress by clicking here....

The Mercantile – Construction Progress – January 2016

The images illustrate the progress made over these past couple of weeks. The excavation process is complete on The Mercantile, a multifamily project located in Bothell. The construction teams have poured the footings and have erected the temporary shoring walls around the perimeter of the building. They are beginning to construct the subgrade garage walls.The historic unreinforced masonry wall has been preserved and the temporary structural supports are still intact. The rustic façade will provide the shell of the ground...

The Mercantile – Construction Progress – December 2015

The Mercantile located in Bothell, WA has completed demolition of the existing commercial building. The historic unreinforced masonry façade has been preserved along 102nd ave and the rest of the site has been cleared and graded.We are excited to see the next steps for The Mercantile, keep track of the construction progress by clicking here....

The Mercantile – Construction Progress – November 2015

The Mercantile will be a seven story multifamily apartment building.  The demolition phase has begun in the month of October.  The original building, the Cooperative Mercantile Company, is an unreinforced masonry structure.  The demolition team has been working to preserve the existing brick façade, which will be incorporated into the new design. The windows and nonstructural walls have been removed.  The back of the building is completely torn down, leaving the existing structure with a few rustic brick walls along 102nd...

Capitol Hill Apartments – Construction Update – October

The Capitol Hill Apartments construction team has completed the exterior framing.  Pedestrians are now able to visualize the upcoming structure.  The building’s penthouse level butterfly roof adds a recognizable angular skyline to the neighborhood.The structure is located atop a hill which allows for sweeping views out towards Lake Washington, the Cascade Mountains, and the local territory. The windows are currently being installed, just in time for the autumn rainfall.  The cantilevered floors will provide weather protection from Seattle’s damp weather climate. ...

Lane Apartments Design Review

Located in the heart of the Northgate Neighborhood, the Lane on fifth Apartments will feature 215 market rate apartments in addition to ground level retail uses.  The project is anchored by a strong retail presence beside the emerging pedestrian streetscape of 5th Avenue NE and generous outdoor amenity spaces including roof deck terraces and a sundeck.Inside the building, residents have access to a number of amenity lounges, a fitness center, extensive bicycle parking facilities, and modern interiors.  The project is...