LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update – August

The month of August brought advances to several areas of construction at the LIV Apartments in Bellevue.  Framing across the site continues upward as crews race to beat the oncoming fall weather. The North Building, the largest of the buildings, framing reached to level five of eight.  Construction speed was increased on the project by using panelized walls which arrive at the site ready to erect. The framing of the South Building was completed and efforts there have shifted towards sealing the...

TDX Renovation – August Update

The renovation of Theta Delta Chi at the University of Washington is well underway as work continues on the roof and portico of this historic building.  The rotten wood shown in the previous post has been removed and new framing and decking serve as a solid base for the waterproofing to soon be installed. Demolition has begun on the main roof of the existing addition.  A rotten unsafe roof deck is removed revealing the roof is in dire need of replacement. Further...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – August

Since the previous LIV Apartments aerial update last month, the progress on the three phase 1 buildings has continued, and construction broke ground on the East building.  The second phase of the project will include 99 residential units, several large amenity spaces, and two large roof decks. Elsewhere on site progress continues at a fever pitch.  The most notable progress as seen from the air would be the progress on the North Building framing.  Framing work is now continuing on level...

Theta Delta Chi - before the 2014 renovation

TDX Renovation work begins

Construction is now underway on the renovation of Theta Delta Chi at the University of Washington. Work is beginning on the portico deck. Improvements to this portion of the building will include rot and damage repair, repairing of the columns & capitals, railing repair, a new waterproof deck, and improved access to the deck. Additional work in this first phase of the renovation will consist of envelope work including replacement of roofing, siding, railings and windows in addition to new...

LIV Apartments – Aerial Photos – July

The LIV Apartments progress continues into July as framing has started on the north building’s level 3 and framing has progressed to level 7 of the south building.  Panels and other materials have begun to be staged on the top post tensioned level of the north building as framing on level 4 will soon begin.Covered in a new high albedo roof, the west building officially topped out and efforts have now shifted towards waterproofing the exterior and installing windows. The...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update – June 2014

The month of June brought many advances to the LIV Apartments job site.  The most notable progress coming as the south building wood framing commenced.  With the previous experience of framing the west building the crews have picked up the pace and are moving very quickly with installing the panelized framing sections.Wood framing for the south building commenced, and reached to level 6 before the end of the month.  As progress continues vertically, other building elements are added such as...

LIV Apartments – Aerial Photos – June 2014

The latest aerial images of the LIV Apartments show the accelerated pace at which the wood framing is being constructed.  The west building framing is complete and work has begun on the south building as progress with framing starts to spread across the site as the structural concrete work is completed for the first phase of the project. The footprint of the north building is starting to emerge as the last post tensioned deck has been completed.  Nearby, the windows of...

Leilani Gains LEED Certification

The Leilani Apartments, our most recently completed multi-family project, was just awarded LEED Certification.   From the start of the project the design team considered sustainability in all aspects of the project.  Through the selection of responsible materials, using local manufacturers and suppliers, utilizing water conservation measures, and many other improvements, the team aimed at designing and building a project that will perform for decades into the future.  In addition to building performance the consideration of resident health and comfort was...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update – May 2014

During May, new heights were reached at the site of the ongoing LIV Apartments.  The most visual of the progress made in May is the west building.  Framing continued and reached level 5 of the 6 level building. Adjacent to the west building, the south building has also entered the framing stage.  Work has started with the exterior walls of level 4, and will then transition to interior walls, and the exterior walls of level 3.  In this instance it is...

LIV Apartments – Aerial Views – May 2014

The latest aerial images of the LIV Apartments have arrived and progress continues onward and upward. The post tensioned concrete floors of the south building have defined the buildings’ footprint, and the relationship of the South and West buildings can start to be seen. At the West building, Wood framing at is nearing completion and framing is about begin on the South building. Between these two buildings a new NE 22nd Place will wind its way through the site and...