The Mercantile – Construction Progress – May 2016
May 23, 2016
The Level 3 post-tension slab is being laid out this week. The back of the structure is beginning to emerge above ground.The supporting deck is assembled with some shoring along the edges.The concrete walls’ framework and shoring is occupying majority of floor space on site. The image on the left displays where the new construction meets the old. A concrete wall will be poured in alignment with the existing masonry wall.Keep updated with the Mercantile project by clicking here.