The Mercantile – Breaking Ground

We are excited to break ground and start construction on The Mercantile, a six story multifamily apartment building, located in the heart of downtown Bothell at the corner of 102nd & Main. The Mercantile will blend the old with new. Originally the site of the Cooperative Mercantile Company’s first building, ca 1908, the new structure will preserve the site’s history as well as the existing brick facades by incorporating them into the new design.The existing façade will feature a new exterior...

Leilani Completion

Leilani Apartments adapted its name from the site’s previous occupant, the Leilani Lanes bowling alley.  The large site is bounded by a wide range of adjacent uses and scales, necessitating a multiple-building response to reduce bulk and scale as well as to provide ground level open space.  The project was completed in 2013 and has since been occupied by residents in the Greenwood area.The exterior has a serene color palette of blues and beige while the interior has a warm...

LIV-Construction Update-June

The LIV Apartments is almost ready to welcome new occupants this July!  The majority of the remaining project’s amenity spaces and landscaping have been completed, including the planters, pavement designs, roof decks, lounges, and many other features.The accent siding at the gateway entrance has been completed and landscaping is underway. The main walking path to the leasing office and building entry will be completed shortly.The main entrance to the West building is lined with the corten steel planters and walkway...

LIV Apartments – Aerial Photos – May

The LIV Apartment is complete with the exterior framing and sheathing, the final exterior finishes will be applied during these next few weeks. We are excited and working hard to finish the West Building in preparation of new tenants in the month of July. The construction teams will continue to work on the remaining buildings.The outdoor spaces are beginning to take form and are vibrant with vegetation. The upper decks have trees planted in the corten steel planters and the roof...

LIV Apartments – Construction Update Mid May 2015

The West Building of the LIV Apartments is ready for occupants in July which is right around the corner. The construction team has been putting the final touches on the West Building’s units and amenity spaces. Construction will continue on the East, West, and South buildings. The vast majority of the exterior for the North, South, and West buildings are sheathed, wrapped, and finished. The image on the right displays the pavers that will soon be installed on the upper decks...

LIV Apartments – Construction Update Mid April 2015

The LIV Apartments is an ongoing multi-family project in Bellevue. This month the landscape components are starting to take form. The main plaza has corten steel planters lining the pedestrian path towards the main entry. The corten steel planters are a reoccurring element throughout the public gathering areas.The upper deck can be accessed from the main entry plaza through the prominent elevator, located to the left in the image above.  The elevator opens onto more staggered corten steel planters.  There...

LIV Apartment – Aerial Photos – April

We have made a lot of progress at the LIV Apartment construction site. The exterior of the East Building is near completion. The East Building has the windows installed and is currently being wrapped with a weather protective membrane. The construction team will begin installing the concrete pavers and landscape to the roof decks, which will be complete with a green roof, dog run, planters, and trees. The South Building’s lower deck is taking form with cast in place benches and...

LIV Apartments – Aerial Photos – March

Construction has been moving along during the month of March, the exterior framing of the East Building has been completed.  All the windows on the westerly buildings have been installed and the construction team is continuing to wrap the building with the weather protective membrane and continue installation of the building’s cladding systems.Due to the great weather exterior work such as painting, cladding, and site work have been accelerated accordingly. The landscaping and construction team has been busy applying finishes...

LIV Apartments – Construction Update Mid March 2015

The exterior shells of the North, South, East and West buildings were completed.  As you can see in the image above, the North Building’s building wrap is being applied against the sheathing.  It will soon look similar to the South Building, shown on the right, with the exterior finishes installed and painted. The corten steel planters have been placed in the lower plaza deck of the North Building with seat wall benches in cast-in-place concrete. These benches will receive a wood...

LIV Apartments – AERIAL PHOTOS – Feb.

Construction at the LIV Apartments in Bellevue has made substantial progress in the recent month.  The East building has reached level 6 of framing and flooring including roof trusses.  The framing of the lower roof deck amenity space on the 5th level is complete and the green roof, concrete pavers, dog run, planters, and trees will be installed next. The large crane previously located in the center of the plaza was removed as the North, South, and West buildings are nearing...