logo
A powerful architecture & Construction theme. Construct your website in the perfect Ratio.
Alienum phaedrum torquatos nec eu, vis detraxit periculis ex, nihil expetendis in mei. Mei an pericula

News

Sibling House Update – 2015

Good news for Sibling House in 2015! Sibling House is a network of homes that keep siblings together while in foster care and they have grown recently to include 256 homes totaling 752 children and they continue to grow every day. You can learn more about their organization and how to help at www.siblinghouse.org. Their annual fundraising event is coming up on March 21st of this year at the Washington Athletic Club with the theme “Alice in Wonderland”. It’s always...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction Update mid Jan 2015

On a recent office site visit to the ongoing LIV Apartments in Bellevue our team was able to observe all of the various stages of construction the project is currently in. This project utilizes phasing as strategy to minimize construction time by distributing the construction over multiple buildings so that the various trades can work without interruption.  For instance, at the second phase, also known as the East Building, framing has only recently started as this phase was delayed so that...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Aerial Photos – Jan.

January has been a productive month at the LIV Apartments in Bellevue.  Progress on the East Building has reached level 5 as framing crews continue to install wall panels and flooring.  Seen in the photo above, crews are framing a lowered roof deck amenity space that will soon be covered with green roof, concrete pavers, a dog run, planters, and trees.  This East Building will have one more level of apartments and amenity spaces before the roof trusses cap the...

Capitol Hill Apartments – Construction Update – January

Our Capitol Hill Apartment project has been progressing through the wet season.  The construction team has been busy with the foundation forms now that shoring has been installed.  The reinforcing rebar can be seen protruding from the completed concrete footings.  The columns are due to be poured later this week, followed by the perimeter foundation walls. The column forms are assembled including rebar and awaiting the future concrete pour. Stay tuned for updates on our Capitol Hill Apartment project!...

LIV Apartments near Microsoft on Bel-Red Road in between Bellevue and Redmond. 450 Unit upscale apartment development.

LIV Apartments – Construction update January

2015 arrives at the job site of the LIV Apartments in Bellevue as crews work at a fevered pace on both the exterior and interior of phase one, and on the framing of the phase 2 East Building. At breaks in the weather painting crews are able to paint the cement board panel siding that the siding subcontractor installed.  Painting progress on the West and South Buildings is nearly complete so the focus has shifted towards the north building. The podium level,...

Distillery Lofts – Tenant Improvement

The Distillery Lofts in the Westlake neighborhood of Seattle has been the new home for Grouparchitect for about a year now so we wanted to reintroduce our completed space as well as extend an invitation for anyone to come by for a private tour and more in-depth introduction to our work. Our office entry is highlighted with past projects displayed in gallery fashion on two accent walls to highlight our range of project types and sizes. Office layout is arranged to maximize natural lighting...

Phinney Ridge Prefab – Module Set

Exciting news on the Pre-fab home front here at Grouparchitect!  The latest collaboration with Method homes is taking shape in the Phinney Ridge neighborhood of Seattle.  This Option series house has been in the works for the last few months, and as detailed in previous blog posts progress has been continuing steadily.  The most exciting part of a pre-fab project is setting the individual modules onto the foundation and several of our staff (as well as most of the neighbors!) were...

LIV Apartments – Aerial Photos – Dec.

December has been a busy month at the LIV Apartments.  Progress on the East Building has reached level 3 as framing crews install wall panels and flooring.  This panelized method of installing wall panels is the quickest way of getting a building of this type constructed.  On average, framing crews can install an entire level of wall panels and floors in a good week.  By the time the January 2015 aerial update is posted it is entirely possible that the...

Plateau 120 Renderings

Plateau 120, our most recent mixed-use project, is nearing submission for UZDP approval with the City of Sammamish.  The project features 92 residential apartment units, over 14,500 square feet of commercial space. Residential parking is contained underground for 100 cars while surface parking lot provides 89 spaces for the commercial area. The project is located along 228th Ave. SE in the foothills of the Cascade Range situated in a beautiful location with an abundance of forest, wetland, and wildlife. The building takes...

LIV Apartments – Construction Update – November

Over the month of November at the LIV Apartments work crews progressed on all aspects of the project.  Painting crews have nearly completed their work on the exterior of the West Building and have shifted efforts to the South Building. At the South Building, masons work at ground level laying brick masonry along the south façade, cladding crews install the weather barrier and cement board siding, and the painters follow behind. Wall panel installation at the east building continues, and current progress...